20 June, 2015

Up On The Roof

June has been a busy month for us.  Too bad our internet connection has been painfully slooooowwww or I would have blogged about what's been happening sooner.  It's still slow, but I can't wait any longer.  For now, I will go fix breakfast while these images are uploading.

One hour and ten minutes later ...

The first week of June brought us the first of the newly hatched iguanas from the nests on our property.  Not sure how many hatchings there were, but we saw at least 10 different individuals on our veranda.
Baby female (left) and male (right) iguanas cling to the screen on our veranda.  We are thrilled that the breeding was successful.
We also commenced on the second phase of the solar power installation.  Queue up the appropriate music by clicking here.  We have 13 (12 and a spare) big batteries for the battery bank.  Each battery weighs 315 lbs!
The crew slipped 3-piece bundles of threaded rod under the handles so they could carry the batteries up the stairs.
These stairs are 4 ft wide to make it easier to get cumbersome items up.
We had intentionally not installed the rails on these stairs so they could bring the batteries up unimpeded. 
At the top of the stairs we had a heavy duty dolly for the battery so we could roll it to the box.
Getting ready to place the first battery in the box.  
The box is specially designed by Dennis so that it is a Faraday Cage to protect the batteries from lightning strikes and lined on the bottom with an acid resistant fabric to soak up battery acid should there be a spill.  Several other safety features are incorporated, too.  He'll share the details in an upcoming blog.
Checking to make sure the batteries are in the right orientation.
Bring 3 batteries up, one at a time, take a break, repeat ...
Only two more to go.
The ProSolar crew cabled up the batteries and tied them in to the charge controllers.  Then our crew put the front on the battery bank box.  The lids come next.
 Meanwhile, up on the roof, the ProSolar crew mounts the 15 solar panels.
The panels are linked into five sets of three panels.
The output from the panels then goes to two charge controllers to charge up the battery bank (via the battery chargers in the inverter units).  DC output from the battery bank goes back to the inverters and then finally to the breaker box in the form of AC electricity.  All this (except the batteries themselves) takes place in the inverter room, which Dennis also designed with lots of safety features.
The inverter room with the charge controllers (smaller black units in the center) and the 2 inverters (the big units on the right).  The grey units (to the left) with blue lights are disconnect switches and surge protectors.
The solar panels are all on the south-facing roof of the new addition.  The pitch of the roof is such that the panels are angled directly toward the sun during the winter months.  This will help compensate for the shorter day length in winter. The angle of the sunlight is not optimal for summer, but the longer day length will offset that.  At least that is how we planned it, time will tell if it actually works out that way.  Theory vs actual.
And here are the 15 panels.  Note the lightning rods along the ridgeline and at the lower eave.  Cables are in the white flexible conduits leading to the inverter room below.
Can't you just feel those photons being absorbed by the solar panels in the image below?  And a good feeling it is, too.
View from the front.
And I will leave you now with a view from the Sunset Balcony.  Goodnight photons.  See you tomorrow.

18 October, 2014

A Roof to Keep Us Dry

I seem to have succumbed to Island Time with regard to my blogging frequency.  Not that we are on an island, but you couldn't tell it from our view.
The increasing frequency of rain squalls are a sure sign that the rainy season is gearing up.  Our goal was to have our addition dried in before the rainy season, but we didn't quite make it.  The top photo below was taken Sept 25th. No roof, no windows, and 4.3 inches of rain in our rain gauge in the previous week.  It seems the rainy season was not aware of our timeline.  The bottom photo was taken today, 23 days and 20 inches of rain later than the top photo.  Now only 1 more door and 1 more window to install and then we will be totally dried in. Yea!  
Another view of the sea. 
 Here is what happened in those 23 days:
The wooden straps that support the sheet metal roof were put in place along with the boards needed to make the eaves.  Those dark things in the sky are dragonflies.  Tens of thousands of them migrated through the day I took this photo.  It was amazing to see them.
 From the inside you can see the roofing trusses and upper level walls. 
The large Santa Maria wood roofing trusses are bolted together with iron plates.  These babies ain't goin' nowhere.
From below you can see the 2x4 wood straps to which the sheet metal (called "zinc" here) will be screwed.
We love these blue sky days.
Another view from below showing the crew securing the last 2 sheets of "zinc" on the north side of the roof.   
Given the irregular shape of the roof, we actually had to start the courses of 10x4ft zinc sheets at the top of the ridge line and work down instead of starting at the bottom and working up.  The next course had to be slipped under the first course.
We used mostly 10x4ft sheets of zinc along with some 8x4 sheets for the corners.  Oddly, the undersides were different colors.  Luckily, that won't show from the inside once we are finished.  However, it isn't uncommon around here for the zinc to be exposed, i.e., for the roof to be the ceiling.  We will be installing rigid insulation against the 2x4 straps and then some sort of finish over the insulation.  Not sure what yet, maybe tongue and groove mahogany paneling.  Suggestions are welcomed! 
Another view of the roof from below.
This is with all the roof, including the ridge cap, up and most of the doors and windows.
 Before and after shots of the north side are below.
Before the zinc and windows.  You can see how the gable end eaves extend out. 
After the zinc, windows, and 3 of 4 doors.
 We had the windows and doors custom made in Spanish Lookout by Peters Glass Shop; we highly recommend them.  I am so happy with how they turned out.  We will be putting up the exterior trim around them next week.
The crew working on the south facing roof.  This is the side on which the solar panels will be mounted.

The sheets of metal roofing are all installed.  Next, we will come back and finish off the gable ends with sheet metal covers and then install the soffit.  That will keep it weather tight.
The collage below shows the southwest corner and the south facing roof during the construction.  Either 18 or 20 solar panels will be mounted on the roof.  A small shed room will be added to the windowless wall to house the inverter and the batteries will run under the windows along the wall on the right.  The space the batteries will be in is on a breezeway that will be covered by a shed roof that links the old cabana with the new addition.  The breezeway will be screened in.
 Once the roof was up, we took the tarps off the Santa Maria wooden beam.  You can see the beam and some of the posts in the collage below.  I had thought that putting the roof on would make the space seem smaller, but it doesn't.  The space is nice and open with plenty of light coming in through the windows.  I'm sure that will change a bit when we put the loft in, but with 10 foot ceilings under the loft, it should still feel open and airy.  
There is still an amazing and daunting amount of work yet to be done.  Getting the solar panels, inverter, and batteries up and running is our priority now.  The panels are being shipped, the batteries and inverter have been sourced and will be ordered next month.  Things are happening!
Looking more like a house every day.